Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13789154
- Product Categories
- Friendly Links
Information Name: | Wall plaster | Shia Tinto wall plaster | stucco plaster Sellers |
Published: | 2015-07-07 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Acceptance: The construction should be preceded by marked tendons. Storey three meters or less horizontal bars located two wall plaster vendors, vertical reinforcement spacing is about 1.5 meters, width of the rib 30 to 50 mm. Plaster thickness by architectural design requirements. Plaster thickness of 5 to 20 mm wall plaster manufacturer, first BZD2 type bottom wall plaster mortar base, then BZM type surface layer of stucco plaster overlay. Plaster thickness more than 8 mm, should be layered construction, the thickness of each layer is controlled within 8 mm, with a layer of the slurry to be final set before the next layer of plaster. The first layer is an adhesive layer, and therefore can not be repeated back to wipe trowel iron in order to avoid the formation of empty stocks slurry displacement from the shell. Press gently on the show have been no obvious signs of the final setting. When using drywall and plastering trowel wipe the slurry wall. Observed the mortar dries the surface slightly, with H-type ruler or scraper tight tie bars screed compaction standard wall plaster, so walls straight. If the surface to be calendered, should be carried out before the final setting of the slurry. Plastering ash fall during the process of cleaning up and repairing the scratch rub down slurry recycling may not be used. After the tools and machinery used in plaster and then complete the job should be cleaned. Completion of construction of the wall should be avoided bump and water will soak and maintain good indoor ventilation. Winter Construction Measures 5 light of day average temperature below 5 ℃ enter winter construction Weifang wall plaster, such as the indoor temperature is below 5 ℃ will not paint during construction, construction in this period to have someone responsible listen to weather forecasts, pay close attention to every day The weather changes, while limiting daily working time and project completions, the day's tasks must pay to live the same day, as a second-day low temperature phenomenon can be used coal for heating or windows with plastic sheeting will be closed to keep the room done balance can not be changed suddenly. Wall plaster | Shia Tinto wall plaster | stucco plaster trader from Beijing Building Materials Co., Shia extension. Wall plaster | Shia Tinto wall plaster | stucco plaster Sellers are Shia Extension Beijing Building Materials Co. (www.xiyatuo.net) this year introduced a new upgrade, the above picture is for reference only, please call the contact or pictures on this page phone, for the latest information, contact: Jiang Jingli. |
Admin>>>
You are the 19374 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Shia Extension Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 19374 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Shia Extension Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility